0102030405
Dryback Flooring - Waterproof Vinyl Plank Flooring
Dryback flooring
Before installation, the existing floor must be flat, stable, dry and clean; Daub the glue onto the floor, 20 to 30 minutes later, do the installation before the glue is thoroughly dry. Flip the tiles lightly with rubber hammer to make them agglutinate firmly; then inspect the defect within one hour. This product is easy in maintenance,mop is enough to make the floor clean. And for click and WPC can be install directly with the concrete floor.